Monday 9 May 2011

What happened in week 4


In the schedule: 5 days: Independent study; group presentations. Tutor availability 3 days


We started on the jackets; putting in jetted pockets with flaps on the outside pieces, working on the lapels and trimming down the centre front, making facings and linings (matching the checks, of course), putting a plain jetted pocket in the facing of the left-hand-side, and putting in the facing and linings.
Friday was an interesting day as we were technically not supposed to be in the studios as they are being moved around for the exhibition of the third-year’s work, however, G did say we three could come in for another short teaching session where he would show us the next steps to do over the weekend, if we came early enough in the morning.  We were contending with people hammering, moving tables, moving sewing machines and generally crashing about, but, sat on the sofas in front of the white board was a very comfortable way of having a session.
As a whole year we were granted an extension this week, moving our deadline from Monday 16th to Wednesday 18th  


No comments:

Post a Comment